Installing new shingles yourself can save considerable time and money, and you can follow the same steps they do to achieve the same professional look. Re-doing the shingles on your roof can help keep your house in good shape, keeping your family safe and protected from the elements. Learn to prepare the roof for shingles, lay even courses, and install your ridge shingles like the experts do.  
 
Installing new shingles yourself can save considerable time and money, and you can follow the same steps they do to achieve the same professional look. Re-doing the shingles on your roof can help keep your house in good shape, keeping your family safe and protected from the elements. Learn to prepare the roof for shingles, lay even courses, and install your ridge shingles like the experts do.  
  
[[Category:Roof Building and Maintenance]]
+
[[Category: Roof Building and Maintenance]]
  
 
== Steps ==
 
== Steps ==
Line 12: Line 12:
 
#*Pry up the nails and loosening the ridge caps. It's ok if you don't get all the nails at first, because you'll have a chance to go back through and remove them later.
 
#*Pry up the nails and loosening the ridge caps. It's ok if you don't get all the nails at first, because you'll have a chance to go back through and remove them later.
 
#*Remove the metal flashing around chimneys, vents, and valleys in the roof. Flashing in the valleys will almost always be trashed, especially. Some roofers will keep some of the flashing that's in good shape, but it's probably worth junking it all when you've got the chance.
 
#*Remove the metal flashing around chimneys, vents, and valleys in the roof. Flashing in the valleys will almost always be trashed, especially. Some roofers will keep some of the flashing that's in good shape, but it's probably worth junking it all when you've got the chance.
#Clean the roof. Sweep the roof as clean as possible. Remove nails that didn't come up earlier. Reattach loose boards in the sheathing. Examine the sheathing for damage and rotted boards, replacing the damaged sections.<ref>http://www.doityourself.com/stry/h2shingle#b</ref>  
+
#Clean the roof. Sweep the roof as clean as possible. Remove nails that didn't come up earlier. Reattach loose boards in the sheathing. Examine the sheathing for damage and rotted boards, replacing the damaged sections.<ref name="rf1">http://www.doityourself.com/stry/h2shingle#b</ref>  
 
#Install underlayment and new flashing. Lay asphalt, felt-paper, or special waterproof underlayment, over the roof. Some roofers will use 15-pound (6.8 kg) roofing paper, which is an effective method.  Be generous with the staples while attaching the paper to the roof deck. Use "tin caps" under staples, if the roof may be exposed to wind before shingles are to be applied.
 
#Install underlayment and new flashing. Lay asphalt, felt-paper, or special waterproof underlayment, over the roof. Some roofers will use 15-pound (6.8 kg) roofing paper, which is an effective method.  Be generous with the staples while attaching the paper to the roof deck. Use "tin caps" under staples, if the roof may be exposed to wind before shingles are to be applied.
 
#*Use sticky back ice and water shield as underlayment where ice dams or leaf and twig dams are likely to build up, and at valleys and where the roof ends at a wall (wide metal flashing may also be used there).
 
#*Use sticky back ice and water shield as underlayment where ice dams or leaf and twig dams are likely to build up, and at valleys and where the roof ends at a wall (wide metal flashing may also be used there).
 
#*Install new flashing. Nail metal flashing called "drip edge" along the outer edges of the roof deck.
 
#*Install new flashing. Nail metal flashing called "drip edge" along the outer edges of the roof deck.
 
#Choose the kind of starter course you will use. You can use narrow tab-less starter shingles if you bought some (GAF Pro-Start is one such brand), or will be cutting your own starter shingles to fit the particular project. Some people like to only have to buy one variety of shingle and cut them to fit, while others prefer the ease of the pre-cut starter shingles without tabs.
 
#Choose the kind of starter course you will use. You can use narrow tab-less starter shingles if you bought some (GAF Pro-Start is one such brand), or will be cutting your own starter shingles to fit the particular project. Some people like to only have to buy one variety of shingle and cut them to fit, while others prefer the ease of the pre-cut starter shingles without tabs.
#Use chalk lines to make a guide for yourself. Depending on the type of shingles you're using and the roof you're working on, you may need to marking a chalk guideline beginning 7 inches (17.8cm) from the bottom roof edge. In either case the glue strip of the starter course is then placed along the drip edge, and at the rake edges as well.<ref>http://www.gaf.com/Roofing/Residential/Products/Starter_Strip_Shingles</ref>
+
#Use chalk lines to make a guide for yourself. Depending on the type of shingles you're using and the roof you're working on, you may need to marking a chalk guideline beginning 7 inches (17.8cm) from the bottom roof edge. In either case the glue strip of the starter course is then placed along the drip edge, and at the rake edges as well.<ref name="rf2">http://www.gaf.com/Roofing/Residential/Products/Starter_Strip_Shingles</ref>
 
#*Mark from the left to right edge of the roof so the chalk line will be seen immediately above each course as a guideline. Continue to chalk additional guidelines based on the width of the shingle through at least four courses (rows) across the roof.
 
#*Mark from the left to right edge of the roof so the chalk line will be seen immediately above each course as a guideline. Continue to chalk additional guidelines based on the width of the shingle through at least four courses (rows) across the roof.
 
===  Installing Three-Tab Shingles ===
 
===  Installing Three-Tab Shingles ===
#Cut your starter-course shingles if necessary. If you are making your own starter shingles, cut the tabs off for the "starter course" (bottom row) of shingles. To prepare the tabs and lay the starter course, shorten the first starter shingle by 6 inches (or about a half of one tab).<ref>http://www.gaf.com/Roofing/Residential/Products</ref> Place the glue strip at and all along the drip edge, and the rake edges as well. You will shingle over this starter course, so the bottom course will be double thickness.
+
#Cut your starter-course shingles if necessary. If you are making your own starter shingles, cut the tabs off for the "starter course" (bottom row) of shingles. To prepare the tabs and lay the starter course, shorten the first starter shingle by 6 inches (or about a half of one tab).<ref name="rf3">http://www.gaf.com/Roofing/Residential/Products</ref> Place the glue strip at and all along the drip edge, and the rake edges as well. You will shingle over this starter course, so the bottom course will be double thickness.
 
#*Instead of cutting off all three tabs, you can also reverse the shingles for a starter course, so that the entire shingle with tabs turned upward are under your first course of shingles. With either method, putting the solid edge at the drip edge and cutting 6 inches off the length of first starter shingle prevents the slots between the tabs from lining up with the first regular course laid over the starter, thus not to expose the asphalt roofing paper through the slots of that bottom row.
 
#*Instead of cutting off all three tabs, you can also reverse the shingles for a starter course, so that the entire shingle with tabs turned upward are under your first course of shingles. With either method, putting the solid edge at the drip edge and cutting 6 inches off the length of first starter shingle prevents the slots between the tabs from lining up with the first regular course laid over the starter, thus not to expose the asphalt roofing paper through the slots of that bottom row.
#*Nail the shingles with no tabs, such as precut Pro-Start shingles,<ref>http://www.gaf.com/Roofing/Residential/Products/Starter_Strip_Shingles</ref> and apply asphalt cement from a caulk gun in many dots along the drip edge under the edge, then press the tab-less shingles down onto the line of asphalt cement dots with adequate spaces between the dots. A continuous bead of asphalt could trap condensation or windblown water under the roofing at some point.
+
#*Nail the shingles with no tabs, such as precut Pro-Start shingles,<ref name="rf2" /> and apply asphalt cement from a caulk gun in many dots along the drip edge under the edge, then press the tab-less shingles down onto the line of asphalt cement dots with adequate spaces between the dots. A continuous bead of asphalt could trap condensation or windblown water under the roofing at some point.
 
#Cut five different lengths for staggering slots. To make sure you've got the right sizes to lay courses correctly, cut several sizes of shingles from the three-tab variety you purchased. Cut off one-half tab-width of the first tab to start the first course. Each cut is needed to shift the slots of the shingles on the course of shingles a 1/2 tab from aligning with the slots in shingles above and below. Keep all scrap, especially any single tabs for use on the ridge cap shingles. Make the following cuts:  
 
#Cut five different lengths for staggering slots. To make sure you've got the right sizes to lay courses correctly, cut several sizes of shingles from the three-tab variety you purchased. Cut off one-half tab-width of the first tab to start the first course. Each cut is needed to shift the slots of the shingles on the course of shingles a 1/2 tab from aligning with the slots in shingles above and below. Keep all scrap, especially any single tabs for use on the ridge cap shingles. Make the following cuts:  
 
#*Cut a half tab off for your first course shingles,  
 
#*Cut a half tab off for your first course shingles,  
Line 43: Line 43:
 
#*Also apply asphalt cement over the nail heads exposed on the last ridge shingle to prevent water leaks.
 
#*Also apply asphalt cement over the nail heads exposed on the last ridge shingle to prevent water leaks.
  
== Video ==
+
 
{{Video:Install Asphalt Shingles|}}
+
 
  
 
== Tips ==
 